|
Here is the
final picture, you can see the travertine steam
shower to the right were the old vanity used to
be.
This is the before picture, where the right hand
vanity is, is where the new steam shower was built
|
Another
master suite, master closet and master
bathroom remodeling project. This one
involved moving the shower to the other
side of the room and building it as a
steam shower. The master closet was
rebuilt as well as the entrance and layout
of the entire suite. A heated travertine
floor added the finishing touches. |
The bathtub after renovations
The before picture shows the old carpeted floor,
the step up and the location of the old shower.
|